Gunnison-Roundhouse.Part 2

March 07, 2001 08:48AM
AFE #T-451 1947-Replace Steam Plant & Pump Station:
Construct Brick Boiler House-leanto addition to Roundhouse structure-8'x10'x10'-back,14'-top. 992 cu.ft.
Foundation-concrete footing 2.24 cu yds..
Excavation 2.9 cu.yds..
Walls-8" brick, upper 1" sheating on 2"x4" studs@24" ctrs.
Electric wireing in conduit-2 outlets.
Floor-6" concrete slab.
Openings-doors & windows--96 sq.ft.
Total $966.11
Install Upright Boiler #218,70# Pressure complete with valves fittings and 12' stack-used for heating purposes only $209.50.
Construct Coal Bin leanto addition to roundhouse structure-28'x8'x5'-back 9' front, 1792 cu.ft..
Walls to eaves 5"S.H. fir braced with 65# & 35# relay rails.
Foundation-concrete 5.44 cu.yds..
Excavation, common 6.22 cu.yds..
Roof-composition on 2" shiplap on 2"x10" rafters @ 40" centers.
Floor-6" concrete.
Electrical wireing in conduit, 1 outlet.
Openings-doors 99.5 sq.ft.. $345.94
Install 1" black pipe, 2' bury,insulated with sponge felt water proof jacket 408 liner feet.
Note: Remainder of mech. equip. and pipe lines from old Boiler House-Structure #32-transfered to the new leanto.
AFE #2397 1950- Alter stalls 7 & 8 to serve RGMW
(Rio Grande Motorway)
Retire 2 roundhouse pits($1315.40)
Brick wall 12"-218 sq.ft.($220.00)
Construct 2 partitions & 2 doors.
Partitions 64'x18 1/2"-12 1/2', sills 4"x8" on 6"x12"x2' blocks 5' ctrs, studs 2"x6" on 2' ctrs.
walls 1" shiplap both sides 1984 sq.ft..Openings-2 overhead doors-
Doors-11'x14'x2"-1 layer of shiplap framed with 4 pcs. of 8"x12"x16' treated pine, 1 door has 6'x4' window, doors hung on overhead trolley-308 sq.ft..
Brick work around doors 56 sq.ft.
Total $1520.78