Welcome! Log In Create A New Profile

Advanced

Gunnison-Roundhouse.Part 1

March 05, 2001 09:14AM
From engineering report page 293 item 2:
Structure #26
Engine House-11 Stall,irregular brick building with composition roof. 257982 cu.ft. $11093.00
Foundation $2810.00
Engine pits $6577.00
Pipe lines $1635.00
Equipment $967.00
Total $23082.00
AFE #1890 1924
Install lighting-open knob, clete type switch &
cutout leads in conduit-21 outlets $351.50
AFE #2936 1927
Retire walls & 5 windows.
Extend 3 stalls 10'.
Foundation-6"x8" second hand lumber.
Walls-frame-single sheathed.
Roof-composition.
Openings-reused 5 windows.
opening- new door-3'2"x8'6"
Total $181.85
AFE #T-6486 1939
Extend 6 stall,retire old walls,roof,openings,etc.
and install steam blower line.
Extension-154'3"x11'6"-24'4" high in front, sloping to 16'9" high in rear.
Extension-frame construction.
Roof-composition.
Walls-wood
Openings-12 doors with 12-12 lite windows in rear.
72 lin.ft. of 3/4" new galv.pipe 7 fittings.
286 lin.ft. 1 1/4" new galv. pipe & fittings.
55 lin.ft. S.H. 1 1/4"galv. iron pipe & fittings.
10 lin.ft. of S.H. 3/4" galv. ppe & fittings.
87 lin.ft. of 4" new black pipe & fittings.
5 3/4" globe valves-new.
1 1 1/4" neww globe valve.
Valve box: new untreated pine .096 mbm. & .053 mbm of S.H. lumber........
Subject Author Posted

Gunnison-Roundhouse.Part 1

John Templeton March 05, 2001 09:14AM



Sorry, you can't reply to this topic. It has been closed.