January 28, 2001 12:27PM
Bob Wright stopped by the other day on his way home for a few days and he reports that he now has four locos being worked on in the Chama shop -- 489, 488, 484, and 463 -- with 487 over the drop-pit in Antonito. And, before the season starts Bob also plans to do more work on 497. The major projects over this winter are the full running gear rebuild of 484 and the boiler work on 488 to conform to the new requirements of FRA Part 230, Form 4.
On any given day the shop crew is likely to be working on two to three locos. As for the tasks being done on each I've reproduced below the work projected for each loco according to RGRPC's contracts with the Commission. Some of the tasks for 484 and 488 are already done and some other tasks have been added, but these lists give a pretty fair idea of the on-going shop work this winter.
497: Complete restoration tasks remaining for locomotive 497, including:
Replace firebox rear grates
Replace firebox archbrick
Install new drawbars
489: Complete restoration tasks remaining for locomotive 489, including:
Repair defective boiler flues/tubes
Replace firebox archbrick
Machine & install new rod bushings
Repair tender tank
Miscellaneous repairs
488: Complete restoration tasks planned for locomotive 488, including:
Boiler Work
Replace rear and front tube sheets
Prepare boiler for tubing
Install Tubes
Superheater Elements
Replace Piping
Lag & Jacket boiler
Paint & Letter Loco
Other Rebuild & Replace Tasks
Rebuild Air pump
Rebuild Injectors
Replace missing Grates
Replace missing Ash Pan
Replace missing Piston Rings
Replace missing Valve Rings
487: Complete restoration tasks remaining for locomotive 487, including:
Repair driver set #1 & reinstall
Machine & Install new rod bushings
Repair tender tank
Replace firebox archbrick
Install new drawbars
484: Complete restoration tasks planned for locomotive 484, including:
Running Gear
Purchase 8 Driver Tires
Install Tires & Turn Drivers
Rebuild Driving boxes
Renew Shoes & Wedges
Renew Crank Pins
Machine & Install new rod bushings
Inspect frame, recondition pedestals
Recondition spring rigging
Tram engine
Set valve timing
Other Rebuild Tasks
Recondition tender bolsters
Rebuild Air pump
Rebuild Injectors
463: Complete restoration tasks remaining for locomotive 463, including:
Repair defective flues/tubes
Replace firebox archbrick
Replace center grate support
Machine & Install rod bushings
Rebuild spring rigging
Re-tire driver set #1 & re-install
Repair tender tank
Install new drawbars
Miscellaneous repairs
Subject Author Posted

C&TSRR Loco Work

Dick Cowles January 28, 2001 12:27PM

Re: C&TSRR Loco Work

Roger Cutter January 28, 2001 02:47PM

Re: C&TSRR Loco Work

Dick Cowles January 28, 2001 09:56PM

Re: C&TSRR Loco Work

Les Clark January 28, 2001 02:55PM

Re: C&TSRR Loco Work

G. W. Laepple January 28, 2001 07:14PM

and in the middle . . .

John Craft January 29, 2001 07:11AM

Re: and in the middle . . .

G. W. Laepple January 29, 2001 12:04PM



Sorry, you can't reply to this topic. It has been closed.