Welcome! Log In Create A New Profile

Advanced

Re: Heisler work nearly done

May 02, 2001 09:08AM
All I can tell you is of our method. We place flat brick across the fire pan and draft tubes at the dampers (this supports the other brick courses). The tongue and groove brick is brought up to about 6 inches from the fire door and between 6 inches and a foot from the tube bundle. the side sheet is stepped between them. An old timer claimed that on the finish of job, the top of the brick should be lined with brown glass bottles that are supposed to melt and seal the brick. I tried it once, the glass never stopped flowing and ended as a pool on the fire pan. I suspect that this was a way to justify the presence of the brown bottles.
Subject Author Posted

Heisler work nearly done

RBrinton April 22, 2001 08:55PM

Re: Heisler work nearly done

Taylor Rush April 22, 2001 10:35PM

Re: Heisler work nearly done

Oil Czar(Jerry Huck SVRy) April 23, 2001 08:09AM

Re: Heisler work nearly done

Taylor Rush April 23, 2001 08:19AM

Re: Heisler work nearly done

Jeff April 30, 2001 05:56PM

Re: Heisler work nearly done

Oil Czar(Jerry Huck SVRy) May 01, 2001 07:45AM

Re: Heisler work nearly done

Taylor Rush May 01, 2001 08:03AM

Re: Heisler work nearly done

Tom Shreve May 01, 2001 09:16AM

Re: Heisler work nearly done

RBrinton May 01, 2001 02:00PM

Re: Heisler work nearly done

Jeff May 01, 2001 05:53PM

Re: Heisler work nearly done

Oil Czar(Jerry Huck SVRy) May 01, 2001 11:52PM

Re: Heisler work nearly done

Tom Shreve May 02, 2001 09:08AM



Sorry, you can't reply to this topic. It has been closed.