cdaspit Wrote:
-------------------------------------------------------
> Isn’t Hillcrest 9 considered to be
> ‘operable’? It was in steam at Railfair ‘91
> and pal’d around with the Passumsic heisler.
> That was this first climax I had ever seen in
> operation. The roaring camp climax had always
> caught my interest so seeing #9 was really cool.
I am unfamiliar with Hillcrest #9. Where was that engine located? I am familiar with Hillcrest #10, and that one is on my list. As noted, that one is technically operable, but has not be run in years and the railroad is not doing annual inspections on it.
/Kevin Madore