Dispatcher Train Sheet
ALAMOSA
Wednesday February 14 1962
Chama extra 499 east with helper engine 488
Engine 499 Sisemore
Engine 488 Dunn
Conductor Andriko
Depart Chama 9:10 AM with 9 loads 1 empty
Arrive Cumbres 10:11 AM, 35 minutes helper off, switching, pick up, unload merchandise
Extra 488 east depart Cumbres time not shown light for Alamosa (stop Sublette pick up section foreman railroad mail)
Extra 499 east depart Cumbres time not shown
Mile Post 312½ 40 minutes work on engine 499
Arrive Alamosa 4:33 PM with 14 loads 26 empties
DURANGO
Farmington branch extra 497
Engineer Schock
Conductor Lyons
Depart Durango 9:00 AM with 1 empty
Carbon Jct 20 minutes switching
Aztec 5 minutes set out
San Juan 30 minutes switching
Arrive Farmington 12:50 PM with 28 loads 1 empty, 40 minutes eat, 1 hour 20 minutes switching
Depart Farmington 2:50 PM with 2 loads 27 empties
Carbon Jct 10 minutes set out
Arrive Durango 5:30 PM with 8 empties