Below are a series of pictures I took on Saturday, 6/10, showing what was accomplished during seven says of intense work in Como.
This photo shows the 60' of track that was added beyond the depot towards the hotel. This allows the engine, and multiple cars, to clear the switch.
Below is the C&S gondola we received on Wednesday.
Below you can see the freshly repainted, C&S boxcar that we use for our tool shed.
Below is the 120' of track added to the mainline towards Gunnison. It ends next to the water tower foundation. This is where the gondola was unloaded.
Here I am looking at the end of track farther back showing the driveway to the roundhouse. There is a rough area we have to cross next and then the driveway. This will require extensive "landscaping."
Edited 13 time(s). Last edit at 06/16/2018 07:08PM by John Meixel.