November 10, 2014 10:58PM
NGDF -

At the last update in July, we had just completed floor wall and floor disassembly. We (Richard especially) have spent a lot of time studying, and drawing the frame components. Here is one view of the sills from the A end
Frame from A end.JPG

The intermediate (Pedestal) sills were of concern. We had hoped to repair and reuse these. For a cosmetic restoration, that would work. But we are still shooting for operation, and these sills just do not have good structural integrity. The B end of this sill (nearest the camera) is completely oil-saturated. How did this happen? The cabinet storage compartment above this sill was lined with sheet metal. Now we can guess why. Decades of leaking oil containers saturated the wood frame below. This did not serve to preserve the wood, but after all that time seems to have "softened" it.

The center sill (inboard) has at least one rotted hole on the bottom large enough to insert your entire hand!
Pedestal sill B end.JPG

There are four spacer blocks (white oak) that hold the brake hangers. Note the vertical bolts through these blocks for reinforcement. But these are badly cracked and dry rotted as well. Note the counter-sunk square head bolts in the sill at left. This detail allows the spring hangers and pedestal bolts to be tightened from below with the floor in place. This detail has to be recreated by hand chiseling.
brake hanger block.JPG

Next, check this interesting repair to the intermediate sill. At some point, the spacer block at this location that was a brake hanger block was replaced. To fit the tenons without disassembling the frame, a slot was cut to extend the sill mortice, then back filled with an insert to reclose the mortice. Car shop ingenuity!
repaired mortice-B center sill.JPG

The end result is that we're getting all of the sills and spacer blocks remade new. We were a bit disappointed in this, as there is some fabric that is lost. But if the 1008 is to reliably operate, the frame must be sound and square.

Bob of AZ
Subject Author Posted

C & S 1008 Update - Evaluating the Frame Attachments

AZfarmer November 10, 2014 10:58PM

Re: C & S 1008 Update - More Hardware Obtained Attachments

AZfarmer November 10, 2014 11:34PM

Re: C & S 1008 Update - More Hardware Obtained

Andre Anderson November 11, 2014 01:41AM

Re: C & S 1008 Update - I'll rebuild that second post

AZfarmer November 11, 2014 09:03AM

Re: C & S 1008 Update - Rebuilt Hardware Post w-Pics

AZfarmer November 13, 2014 10:46PM

Re: C & S 1008 Update - Spring Hanger Fabrication Attachments

AZfarmer November 10, 2014 11:34PM

Re: C & S 1008 Update - Spring Hanger Fabrication

Tim Schreiner November 11, 2014 10:55AM

Re: C & S 1008 Update - Spring Hanger Fabrication Attachments

jalbers November 13, 2014 01:51PM

Re: C & S 1008 Update - Spring Hanger Fabrication

AZfarmer November 13, 2014 10:29PM

Re: C & S 1008 Update - Spring Hanger Fabrication

bcp November 13, 2014 10:54PM

Re: C & S 1008 Update - Spring Hanger Fabrication

Fred H. November 14, 2014 04:58PM