Thursday April 28 1949
ALAMOSA
No. 215 with engine 476
Conductor Morgan
Engineer Holly (to Chama)
Engineer Dieckman (from Chama)
Depart Alamosa 7:00 AM with 4 cars
119
167
310
Durango
Arrive Cumbres 10:23 AM
Depart Cumbres 10:26 AM
Arrive Chama 11:10 AM
Depart Chama 11:15 AM
Arrive Gato 1:15 PM
Depart Gato 1:21 PM
Arrive Durango 4:05 PM with 4 cars
No. 216 with engine 478
Conductor Edmisten
Engineer Peterson (to Chama)
Engineer Holly (from Chama)
Depart Durango 11:15 AM with 4 cars
65
169
327
Chama
Arrive Gato 1:45 PM
Depart Gato 1:50 PM
Arrive Chama 4:00 PM
Depart Chama 4:05 PM
Arrive Cumbres 5:02 PM
Depart Cumbres 5:05 PM
Arrive Alamosa 8:30 PM with 4 cars
Alamosa extra 485-480 west, both engines stay on to Chama
Conductor Duxstadt
Engine 485 Donaldson
Engine 480 Hall
Depart Alamosa 11:59 AM with 36 loads 32 empties
La Jara 5 minutes set out, spot
Arrive Antonito 1:30 PM with 36 loads 31 empties, 1 hour 10 minutes switching and eat
Depart Antonito 2:40 PM with 36 loads 24 empties
Sublette 10 minutes water
Toltec 20 minutes meet No. 216
Arrive Cumbres 7:50 PM with 36 loads 24 empties, 20 minutes inspection
Depart Cumbres 8:10 PM with 36 loads 24 empties
Arrive Chama 9:20 PM with 36 loads 24 empties
Durango extra 486-488 east
Conductor Knight
Engine 486 Rhodes
Engine 488 J Connor
Depart Durango 11:59 AM with 31 loads 9 empties
La Boca 25 minutes water and meet No. 215
Gato 25 minutes eat and merchandise
Lumberton 5 minutes merchandise
Monero 25 minutes merchandise, coal & water, pick up
Arrive Chama 8:15 PM with 35 loads 9 empties
SALIDA
Salida extra 497 west with helper engines 491 and 494, to Gunnison
Conductor R Young
Engine 497 Frantz
Engine 491 Hyatt
Engine 494 W Wilson
Depart Salida 1:30 PM with 11 loads 41 empties
1 company material Gunnison
4 lumber Gunnison
2 feed Gunnison
40 empty gons Gunnison
3 pipe Gunnison
1 company pipe Mears Jct
Caboose
Mile Post 217¾ 40 minutes blocked by B&B outfit
Mears Jct 15 minutes set out and water
Arrive Marshall Pass 5:15 PM consist not shown, probably 10 loads 41 empties, 25 minutes helper engines off, inspection
Extra 491 west depart Marshall Pass time not shown light for Gunnison
Extra 494 west depart Marshall Pass time not shown light for Gunnison, behind extra 497 west
Extra 497 west depart Marshall Pass 5:40 PM
Buxton 15 minutes switching
Sargent 30 minutes switching and set coal
Steele 15 minutes hot box
Arrive Gunnison 9:30 PM with 10 loads 90 empties
GUNNISON
Engine 498 used to switch Gunnison yard foreman Anderson engineer Braswell
MONTROSE
No narrow gauge trains
Montrose switch engine 345 foreman Trevarthen engineer Price
DURANGO
Silverton branch and Farmington branch no trains
Durango switch engine 315 foreman Rowe engineer House
Jimmy