Sunday April 17 1949
ALAMOSA
No adverse weather
No. 215 with engine 476
Conductor Hines
Engineer Nissen (to Chama)
Engineer Peterson (from Chama)
Depart Alamosa 7:00 AM with 5 cars
65
169
326
319
Chama
Arrive Cumbres 10:19 AM
Depart Cumbres 10:23 AM
Arrive Chama 11:10 AM
Depart Chama 11:15 AM
Arrive Durango 4:05 PM with 5 cars
No. 216 with engine 489
Conductor Edmisten
Engineer Cummins (to Chama)
Engineer Nissen (from Chama)
Depart Durango 11:15 AM with 5 cars
119
167
323
310
Durango
Arrive Chama 4:00 PM
Depart Chama 4:05 PM
Arrive Cumbres 4:59 PM
Depart Cumbres 5:03 PM
Arrive Alamosa 8:30 PM with 5 cars
SALIDA
Alamosa extra 499 east, Valley line
Conductor D Young
Engineer Frantz
Depart Alamosa 6:05 AM with 6 loads 10 empties
Hooper 5 minutes set out
Moffat 5 minutes pick up
Villa Grove 10 minutes set out and water
Mears Jct 5 minutes set out and water
Poncha Jct 5 minutes set out merchandise
Arrive Salida 10:40 AM with 5 loads 1 empty
No other narrow gauge activity this date, Sunday
Jimmy