Welcome! Log In Create A New Profile

Advanced

Sargents Part-3

June 01, 2001 08:50AM
NOTICE: there is a brief mention about modeling in the below information, be so warned, if you are the type that gets offended by this. Now on with todays report.
From engineering report page#287 item#15
Section laborer's house-improved carbody $167.00
(part of structure #18)
From engineering report page#288 item#1
Structure #18
Section House-
frame building-16'x20'x14' 4480 cu.ft. $403.00
Roof-wood shingle.
Foundation $141.00.
Leanto addition $20.00.
From engineering report page#288 item#2
Misc. Building Improvements
Double Outhouse-4'x8'x7'6" $52.00
Misc.sheds $35.00
Outhouse $20.00
Total $107.00
From engineering report page#288 item#3
Tool House-
(Structure #20)
Frame building-10'x14'x10'6" 1470 cu.ft.$116.00.
Roof-wood shingle
Foundation and runway $38.00
AFE #1525 1948
Retire-Tool house
Replace with Armco Steelox Tool & Motor car house on 6"x8" treated pine blocking.------------
The following contains a modeling statement-For those that get all wound up by reading about modeling on this list please skip, Thank You
(darn nice of Grandt Line to make these neat little structures, at least for those of us in HO)
Runway made of second hand scrap iron and ties.
AFE 1525 cost $667.79.
From engineering report page#288 item#4
Section Laborer's House
Structure #10
Bunk house-improved carbody $135.00
From engineering report page#288 item#5
Section Laborer's House
Structure #10
Bunk house-improved carbody $89.00
For the Sargents Outhouse scorecard:
1 single & 3 doubles, lots of room, no waiting...
Subject Author Posted

Sargents Part-3

John Templeton June 01, 2001 08:50AM



Sorry, you can't reply to this topic. It has been closed.